passquick.com offers incredible career enhancing opportunities. We are a team of IT professionals that focus on providing our customers with the most up to date material for any IT certification exam. This material is so effective that we Guarantee you will pass the exam or your money back.
922-097 Exam
Comm.Server 1000 Upgrades to Rls.5.0 for Technicians
- Exam Number/Code : 922-097
- Exam Name : Comm.Server 1000 Upgrades to Rls.5.0 for Technicians
- Questions and Answers : 25 Q&As
- Update Time: 2009-12-08
- Price:
$ 79.00$ 58.00
Free 922-097 Demo Download
PassQuick offers free demo for NCSS 922-097 exam (Comm.Server 1000 Upgrades to Rls.5.0 for Technicians). You can check out the interface, question quality and usability of our practice exams before you decide to buy it. We are the only one site can offer demo for almost all products.
Download 922-097 Practice Exams Pdf
922-097 Exam Study Guide:
922-097 exam is regarded as one of the most favourite NCSS certifications. Many IT professionals prefer to add 922-097 exam among their credentials. PassQuick not only caters you all the information regarding the 922-097 exam but also provides you the excellent 922-097 study guide which makes the certification exam easy for you.
PassQuick 922-097 Study Guide Contents:
PassQuick 922-097 study guide covers all the exam objectives to pass 922-097 exam. It includes 922-097 practice test, 922-097 braindumps, free 922-097 demo. you can free download PassQuick 922-097 demo now.
PassQuick 922-097 Feature:
* High quality - High quality and valued for the 922-097 Exam: 100% Guarantee to Pass Your 922-097 exam and get your NCSS certification.
* Authoritative - Authoritative study guide with complete details about 922-097 exam.
* Cheaper - Our PassQuick products are cheaper than any other website. With our completed NCSS resources, you will minimize your NCSS cost and be ready to pass your 922-097 exam on Your First Try, 100% Money Back Guarantee included!
* Free - Try free NCSS demo before you decide to buy it in http://www.passquick.com .
PassQuick 922-097 Guaranteed:
By purchasing our 922-097 exam, you will have all that is necessary for completing the 922-097 exam with all 922-097 study guide that is always up to date. You will receive the highest quality and support with PassQuick customer service (live chat) that will fulfill all of your certification needs. After you purchase our product, we will offer free update in time for 90 days.Purchase our 922-097 study guide today, simply put, PassQuick is your key to opening up new doors for a brighter future!
Exam : Nortel 922-097
Title : Comm.Server 1000 Upgrades to Rls.5.0 for Technicians
1. A customer with a Communication Server (CS) 1000E at Rls. 4.5 with an Media Gateway (MG) 1000T containing three chassis is planning to migrate the functionality of the MG 1000T into the CS 1000E High Availability system, and then upgrade the system to Rls. 5.0. The system Signaling Servers are Nortel ISP 1100 servers. What must be done to the Signaling Server to complete the upgrade?
A. Upgrade the server software to Rls. 5.0 only.
B. Replace the hardware to CP-PM Signaling Server.
C. No action is required; the Signaling Server can remain at Rls. 4.5.
D. Upgrade the memory to 1 GB followed by a software upgrade to Rls. 5.0.
Answer: D
2. A customer is upgrading an existing Communication Server (CS) 1000S at Rls. 5 to a CS 1000E Rls. 5.0 Standard Availability with a single IP Media Gateway (MG) 1000E chassis. Which components must be replaced in the MG 1000S to complete the upgrade?
A. SSC Card
B. Call Server
C. Voice Gateway Media Card
D. Nortel IPS 1100 Signaling Server
Answer: A
3. A customer is upgrading an existing Communication Server (CS) 1000S at Rls. 4.5 to a CS 1000E Rls. 5.0 Standard Availability. A CP-PM Call Server card is being installed during the upgrade. The CP-PM Call Server card has been installed into Slot 1 and configured. What is the next sequential step in the upgrade process?
A. Reboot the card to begin the software installation.
B. Connect the administration console to Port 0 of the NTAK19EC SDI cable.
C. Insert the RMD containing the Rls. 4.5 customer database into the faceplate of the CP-PM Call Server card.
D. Insert the bootable RMD containing software installation files into the faceplate of the CP-PM Call Server card.
Answer: B
4. A customer is upgrading an existing Communication Server (CS) 1000S at Rls. 4.5 to a CS 1000E Rls. 5.0 with a single IP Media Gateway 1000E chassis. In this configuration, which slot in the IP Media Gateway houses the Media Gateway Controller Card?
A. Slot 0
B. Slot 1
C. Slot 2
D. Slot 3
Answer: A